SomervilleWater Damage Restoration
ALL Plaster, lath and old-growth floors

Structural Drying in Somerville, MA

Structural drying dries the building, not just the surface. The drying team maps moisture, sets air movers and dehumidifiers to the evaporation load and keeps equipment running until readings meet the IICRC S500 goal.

(888) 629-3140Walls still wet? Get them properly dried
  • IICRC S500 standard
  • LGR and desiccant units
  • Moisture mapping
  • Daily readings
Air movers and a dehumidifier drying opened wall framing during a structural dry-out
StandardIICRC S500
Goal2 to 4 points of dry
EquipmentLGR and desiccants
PaperworkDaily psychrometric logs
Right now

What to do the moment you find wet walls, floors or framing

  1. 1

    Stop the water source

    No drying works while water still feeds the wall or floor.

  2. 2

    Get air moving

    Open interior doors; in dry weather, open windows. In humid weather keep them shut.

  3. 3

    Pull up soaked rugs

    Area rugs and loose items off wet floors so air reaches the surface.

  4. 4

    Do not seal it in

    Hold off on paint, new flooring or closing walls until readings say dry.

The approach

How structural drying is handled in Somerville

  • Rapid local response

    The drying team works across Somerville day and night, because drying goes faster the sooner it starts.

  • IICRC S500 drying standard

    Equipment is sized to the room's evaporation load and the Class of loss, and stays until readings say dry.

  • Claim-ready documentation

    Psychrometric readings and material readings are logged every day for the file.

  • Somerville water experts

    Plaster and lath, balloon framing and old-growth floors dry differently from new construction.

Typical cost ranges

What does structural drying cost in Somerville, MA?

In Somerville, MA, structural drying typically runs $1,500 to $4,500 for one or two rooms and $4,500 to $14,000 for several rooms, plaster walls or a multi-floor loss. The Class of loss, the materials (plaster and hardwood take longer), the square footage and how fast drying started set the cost.

$1,500 to $4,500

One or two rooms

  • Class 1 to 2 loss
  • Air movers and LGR
  • Three to five days
$4,500 to $10,000

Several rooms or plaster

  • Class 3 loss
  • Cavity drying
  • Five to seven days
$8,000 to $16,000+

Hardwood, masonry, multi-floor

  • Class 4 materials
  • Desiccants and floor mats
  • Extended monitoring

For a planning number on your own loss, try the water damage cost calculator. The final figure comes from the on-site walkthrough and the moisture map.

Step by step

The structural drying process, start to dry

  1. Moisture mapping

    The tech who does the walkthrough maps every wet material and picks a dry reference in the same building.

  2. Set the equipment

    Air movers go in at the evaporation load, with LGR dehumidifiers or desiccants for dense materials.

  3. Daily psychrometrics

    Temperature, humidity and material readings are logged daily, and the setup is adjusted.

  4. Verify dry

    Equipment comes out when wet materials read within 2 to 4 points of the dry reference.

Structural drying in Somerville means drying buildings that were put together a century ago. Plaster on wood lath, balloon-framed walls with open cavities from basement to roof, thick old-growth floor boards and fieldstone foundations all hold water differently from modern drywall and plywood. Drying them properly takes measurement, not guesswork.

What the IICRC S500 standard requires

IICRC S500 is the industry standard for water damage restoration. It sets out how to classify a loss, how to size drying equipment and how to confirm the building is dry. Two classifications drive the plan:

  • Category 1, 2 and 3 describe how clean the water is, which decides what is dried and what is removed.
  • Class 1 through 4 describe how much water is in the materials and how hard they are to dry, which sets how much equipment a room needs.

Plaster, hardwood and masonry are often Class 4 materials: dense, slow to release water and in need of low humidity, directed air or desiccant dehumidification.

How the drying goal is set

The drying goal is not a date on a calendar. The drying team takes a reading from the same material in an unaffected part of the building, the dry reference, and dries the wet material until it reads within 2 to 4 points of it. Daily psychrometric readings (temperature, relative humidity and grains per pound) show whether the dehumidifiers are keeping up. Equipment stays until the readings say dry, not until the surface looks dry.

Balloon framing and hidden water

Many older Somerville houses are balloon framed, with wall cavities that run from the basement to the attic. Water that enters on an upper floor can travel down inside those cavities. Thermal imaging and pinless meters follow it, and small access openings let air into the cavity. The EPA indoor air quality pages explain why moisture control matters, and NIST publishes building science research. See emergency water removal for the step that comes first.

Service area

Structural drying help across all three Somerville ZIP codes

The Somerville restoration crew works 02143, 02144 and 02145, from Union Square and Winter Hill to Davis Square and Ten Hills, plus nearby Cambridge, Medford, Arlington, Charlestown, Everett.

See every Somerville neighborhood covered
Answers

Structural Drying questions

Q1What is the difference between structural drying and using fans?

Fans move surface moisture around. Structural drying measures the water inside materials, sizes air movers and dehumidifiers to the load and verifies the result with readings.

Q2What is a dry reference?

A reading from the same kind of material in an unaffected part of the building. Wet materials are dried until they read within 2 to 4 points of it.

Q3Why does plaster take longer than drywall?

Plaster is denser and thicker, and lath and framing behind it hold water, so it releases moisture more slowly.

Q4What is an LGR dehumidifier?

A low grain refrigerant dehumidifier pulls more water out of the air than a household unit, keeping humidity low enough for dense materials to dry.

Q5When are desiccant dehumidifiers used?

For Class 4 materials like hardwood, plaster and masonry, and in cold spaces where refrigerant units lose efficiency.

Q6How long does structural drying take?

A contained Class 1 loss usually dries in three to five days. Hardwood, plaster and masonry take longer, and equipment leaves on readings.

24/7 across Somerville, MA

Wet plaster, floors or framing in Somerville?

Surface-dry is not dry. Readings against a dry reference show when the structure is really ready for repairs.

Call (888) 629-3140Somerville, 24/7